Standard a 4 uses 1 in.
Concrete wall ties for plywood forms.
Ocm inc stsec 6hh 6 wall x 4 3 4 end hex head plastic cone snap ties can be used with either the 1 or 2 forming systems with 3 4 plywood.
This snap tie forming method is used for retaining and standard walls batter walls bridges concrete signs footings etc.
Emi construction products is your source for construction supplies including concrete forms concrete accessories plywood forms wall ties aluminum forming supplies and a variety of other construction materials.
Compatible with advance and duraform style formwork.
Every snap tie includes two 1 plastic cones.
After the plywood is stripped the plastic cone and exposed tie end are removed with a twist.
R1 supply has great prices on snap ties and wedges you need for a variety of concrete form work to build retaining walls and landscaping borders of all sizes.
Odd end oe snap ties measure 4 3 4 at one end and 8 1 4 at the other end plus the wall thickness.
The cones allow the snap tie to be broken off inside the concrete for surface patching.
Resi ties and 1 1 8 systems are commonly used in residential construction to shape concrete foundations.
A form tie is an accessory used in formwork used to hold the concrete wall forms firmly against the lateral pressure of freshly placed plastic concrete.
The seawolf system utilizes symons steel ply modular concrete forms for the exposed concrete face and plywood on the inaccessible side.
Resi ties for 1 1 8 plywood or resi ply forming systems available.
This unique approach to one sided wall forming eliminates the need for weld on ties concrete rock wood anchors or a frame supports which results in dramatic labor and equipment savings.
Ocm inc stsec 6hh 6 wall x 4 3 4 end hex head plastic cone snap ties can be used with either the 1 or 2 forming systems with 3 4 plywood.
1 800 684 0822 login or sign up.
They are held in place by a snaptie wedge or jahn bracket.
The plastic cones set the wall dimension and cover the plywood hole.
They are held in place by a snaptie wedge or jahn bracket.
They maintain equal space between the forms which results in uniform thickness of walls.
This snap tie forming method is used for retaining and standard walls batter walls bridges concrete signs footings etc.
Measure 8 1 4 at each end plus the wall thickness.
A form tie contains two parts namely internal tension member and external holding device.
The heavy wedge is used with short and long end snap ties on stick built forms.
Used with double 2 x4 horizontal walers and double 2 x4 vertical strong backs.